The following list shows the minimum equipment that would be required to establish a small-
The list is not comprehensive, and some of the equipment required is proprietary and must be custom-
In addition, some equipment cannot be specified until the environmental requirements of the desired location are known.
However, in general terms, the minimum required equipment is as follows:
Many people think that there is a single plating “machine” that does all of the work, but this list (together with the process description shown here) explains the situation a little more clearly.
All of this equipment together with the required working space and storage areas will probably take up a minimum of around 2000 sq.ft (approximately 200 m2)